[{"data":1,"prerenderedAt":260},["ShallowReactive",2],{"\u002Fv5\u002Fdokos\u002Fproduction\u002Fvue-gantt-ordres-fabrication":3,"section:\u002Fv5\u002Fdokos\u002Fproduction\u002Fvue-gantt-ordres-fabrication":259},{"id":4,"title":5,"body":6,"description":247,"extension":248,"meta":249,"navigation":250,"path":255,"seo":256,"stem":257,"__hash__":258},"docs\u002F1.v5\u002F1.dokos\u002F09.production\u002F10.vue-gantt-ordres-fabrication.md","Vue Gantt des ordres de fabrication",{"type":7,"value":8,"toc":239},"minimark",[9,13,22,43,48,67,70,84,92,96,99,207,210,213,217,220,231],[10,11,5],"h1",{"id":12},"vue-gantt-des-ordres-de-fabrication",[14,15,16,17,21],"p",{},"La vue Gantt de l'",[18,19,20],"strong",{},"Ordre de travail"," affiche vos ordres de fabrication sur une frise chronologique. Chaque barre représente un ordre de travail :",[23,24,25,37,40],"ul",{},[26,27,28,29,32,33,36],"li",{},"la barre commence à la ",[18,30,31],{},"Date de début prévue"," et finit à la ",[18,34,35],{},"Date de fin prévue"," ;",[26,38,39],{},"le remplissage de la barre montre l'avancement : quantité produite divisée par la quantité à produire ;",[26,41,42],{},"la couleur de la barre indique le statut de l'ordre.",[44,45,47],"h2",{"id":46},"accéder-à-la-vue-gantt","Accéder à la vue Gantt",[49,50,51,58,61],"ol",{},[26,52,53,54,57],{},"Ouvrez la liste des ",[18,55,56],{},"Ordres de travail",".",[26,59,60],{},"Cliquez sur le sélecteur de vue en haut à droite de la liste.",[26,62,63,64,57],{},"Sélectionnez ",[18,65,66],{},"Gantt",[14,68,69],{},"Vous pouvez ajuster la période affichée (jour, semaine, mois) à l'aide des contrôles situés en haut de la vue.",[14,71,72,73,76,77,80,81,57],{},"La vue propose trois filtres : ",[18,74,75],{},"Commande client",", ",[18,78,79],{},"Article de production"," et ",[18,82,83],{},"Entrepôt (Travaux en Cours)",[85,86,89],"callout",{"color":87,"icon":88},"blue","i-mdi-information",[14,90,91],{},"La liste des ordres de travail exclut par défaut les ordres au statut « Arrêté ». Retirez ce filtre pour les voir dans la vue Gantt.",[44,93,95],{"id":94},"code-couleur-des-statuts","Code couleur des statuts",[14,97,98],{},"La couleur de chaque barre correspond au statut de l'ordre de fabrication :",[100,101,102,118],"table",{},[103,104,105],"thead",{},[106,107,108,112,115],"tr",{},[109,110,111],"th",{},"Statut",[109,113,114],{},"Couleur",[109,116,117],{},"Signification",[119,120,121,133,144,154,165,176,186,196],"tbody",{},[106,122,123,127,130],{},[124,125,126],"td",{},"Terminé",[124,128,129],{},"Vert",[124,131,132],{},"La production est achevée",[106,134,135,138,141],{},[124,136,137],{},"En cours",[124,139,140],{},"Orange",[124,142,143],{},"La production est en cours",[106,145,146,149,151],{},[124,147,148],{},"Stock partiellement réservé",[124,150,140],{},[124,152,153],{},"Une partie des matières premières est réservée",[106,155,156,159,162],{},[124,157,158],{},"Stock réservé",[124,160,161],{},"Bleu",[124,163,164],{},"Toutes les matières sont réservées, l'ordre est prêt",[106,166,167,170,173],{},[124,168,169],{},"Brouillon",[124,171,172],{},"Rouge",[124,174,175],{},"L'ordre n'est pas encore validé",[106,177,178,181,183],{},[124,179,180],{},"Non Commencé",[124,182,172],{},[124,184,185],{},"L'ordre est validé mais la production n'a pas commencé",[106,187,188,191,193],{},[124,189,190],{},"Arrêté",[124,192,172],{},[124,194,195],{},"La production est temporairement interrompue",[106,197,198,201,204],{},[124,199,200],{},"Annulé",[124,202,203],{},"Gris",[124,205,206],{},"L'ordre est annulé",[14,208,209],{},"Le statut « Clôturé » n'a pas de couleur dédiée : la barre garde la couleur par défaut de la vue Gantt.",[14,211,212],{},"Les couleurs utilisent les variables du thème de l'application. Elles s'adaptent au mode sombre.",[44,214,216],{"id":215},"suivi-de-la-production","Suivi de la production",[14,218,219],{},"Utilisez cette vue pour :",[23,221,222,225,228],{},[26,223,224],{},"repérer les ordres en retard : une barre rouge ou orange dont la date de fin prévue est passée ;",[26,226,227],{},"visualiser la charge de production sur une période ;",[26,229,230],{},"prioriser les ordres dont le stock est réservé (barres bleues) mais pas encore commencés.",[14,232,233,234,57],{},"Pour planifier les opérations par station de travail, voir ",[235,236,238],"a",{"href":237},"\u002Fv5\u002Fdokos\u002Fproduction\u002Fcarte-travail","Carte de travail",{"title":240,"searchDepth":241,"depth":242,"links":243},"",1,2,[244,245,246],{"id":46,"depth":242,"text":47},{"id":94,"depth":242,"text":95},{"id":215,"depth":242,"text":216},"Visualisez la planification de vos ordres de travail dans la vue Gantt et identifiez leur statut grâce au code couleur.","md",{"reviewed":250,"last_verified":251,"sources":252},true,"2026-11-03",[253,254],"erpnext\u002Fmanufacturing\u002Fdoctype\u002Fwork_order\u002Fwork_order_calendar.js","erpnext\u002Fmanufacturing\u002Fdoctype\u002Fwork_order\u002Fwork_order_list.js","\u002Fv5\u002Fdokos\u002Fproduction\u002Fvue-gantt-ordres-fabrication",{"title":5,"description":247},"1.v5\u002F1.dokos\u002F09.production\u002F10.vue-gantt-ordres-fabrication","Vo5rreNrm3JaTPEh987z4H1qWvriMZnI1svi0KW-PXk",{},1794870112092]